Enron Mail

From:rika.imai@enron.com
To:harry.arora@enron.com, robert.benson@enron.com, dana.davis@enron.com,doug.gilbert-smith@enron.com, rogers.herndon@enron.com, m..presto@enron.com, j..sturm@enron.com, lloyd.will@enron.com
Subject:Weekly Nuke Recap
Cc:
Bcc:
Date:Tue, 13 Nov 2001 16:30:04 -0800 (PST)

The following is a status report from the consultant. This information will be revised to look the the Daily Recap report and then posted weekly on the website.

We will also continue to provide a list of the outages that we hear about from the newswire separately.

13-Nov-01

Plants Net Mwe Current Status Comments
ECAR
1 BEAVER VALLEY 1 810 Operating
2 BEAVER VALLEY 2 833 Operating
3 DAVIS BESSE 877 Operating
4 DC COOK 1 1020 Operating
5 DC COOK 2 1090 Operating
6 FERMI 2 1098 Refueling Restart expected 12/1/01
7 PALISADES 780 Regulatory Outage for Nozzle Cracking Restart expected late January 2002
8 PERRY 1 1194 Operating
ERCOT
1 COMANCHE PEAK 1 1150 Operating
2 COMANCHE PEAK 2 1150 Operating
3 SOUTH TEXAS 1 1250 Operating
4 SOUTH TEXAS 2 1250 Operating
FRCC
1 CRYSTAL RIVER 3 825 Operating
2 ST LUCIE 1 839 Operating
3 ST LUCIE 2 839 Operating
4 TURKEY POINT 3 693 Operating
5 TURKEY POINT 4 693 Operating
MAAC
1 CALVERT CLIFFS 1 825 Operating
2 CALVERT CLIFFS 2 825 Operating
3 HOPE CREEK 1031 Refueling (not confirmed) Restart expected 11/16/01
4 LIMERICK 1 1055 Operating
5 LIMERICK 2 1108 Operating
6 OYSTER CREEK 1 610 Operating
7 PEACH BOTTOM 2 1100 Operating
8 PEACH BOTTOM 3 1100 Operating
9 SALEM 1 1106 Operating
10 SALEM 2 1106 Operating
11 SUSQUEHANNA 1 1090 Operating
12 SUSQUEHANNA 2 1094 Operating
13 THREE MILE ISLAND 1 786 Refueling/Steam Gen Tube Repair Restart expected 11/24/01
MAIN
1 BRAIDWOOD 1 1134 Operating
2 BRAIDWOOD 2 1134 Operating
3 BYRON 1 1116 Operating
4 BYRON 2 1116 Operating
5 CLINTON 1 930 Operating
6 DRESDEN 2 794 Operating Just completed refueling on 11/9/01
7 DRESDEN 3 794 Operating
8 KEWAUNEE 503 Refueling / Steam Gen Replacement Restart expected 11/27/01
9 LASALLE 1 1078 Operating
10 LASALLE 2 1078 Operating
11 POINT BEACH 1 485 Operating
12 POINT BEACH 2 485 Operating
13 QUAD CITIES 1 789 Operating
14 QUAD CITIES 2 789 Operating
MAPP
1 COOPER 764 Refueling (not confirmed) Started 11/3/01; Restart expected 12/13/01
2 DUANE ARNOLD 538 Operating
3 FORT CALHOUN 478 Operating
4 MONTICELLO 600 Refueling Started 11/3/01; Restart expected 12/16/01
5 PRAIRIE ISLAND 1 540 Operating
6 PRAIRIE ISLAND 2 540 Operating
NPCC (NEPOOL)
1 MILLSTONE 2 870 Operating
2 MILLSTONE 3 1149 Operating
3 PILGRIM 1 670 Operating
4 SEABROOK 1162 Operating
5 VERMONT YANKEE 504 Operating
NPCC (NYPP)
1 FITZPATRICK 780 Operating
2 GINNA 470 Operating
3 INDIAN POINT 2 975 Operating
4 INDIAN POINT 3 965 Operating
5 NINE MILE POINT 1 610 Operating
6 NINE MILE POINT 2 1137 Operating
SERC
1 BROWNS FERRY 2 1065 Operating
2 BROWNS FERRY 3 1065 Operating
3 BRUNSWICK 1 767 Operating
4 BRUNSWICK 2 754 Operating
5 CATAWBA 1 1129 Operating
6 CATAWBA 2 1129 Operating
7 FARLEY 1 822 Refueling Restart expected 11/15/01
8 FARLEY 2 854 Operating
9 HARRIS 860 Refueling / Steam Gen Replacement Restart expected 12/6/01
10 HATCH 1 800 Operating
11 HATCH 2 818 Operating
12 MCGUIRE 1 1129 Operating
13 MCGUIRE 2 1129 Operating
14 NORTH ANNA 1 893 Operating
15 NORTH ANNA 2 897 Operating
16 OCONEE 1 846 Operating
17 OCONEE 2 846 Operating
18 OCONEE 3 846 Refueling Started 11/10/01; Restart expected 12/15/01
19 ROBINSON 2 683 Operating
20 SEQUOYAH 1 1148 Refueling Restart expected 11/27/01
21 SEQUOYAH 2 1148 Operating
22 SUMMER 885 Operating
23 SURRY 1 801 Refueling (not confirmed) Restart expected 11/15/01
24 SURRY 2 801 Operating
25 VOGTLE 1 1162 Operating
26 VOGTLE 2 1162 Operating
27 WATTS BAR 1 1150 Operating
SPP
1 ARKANSAS 1 836 Operating
2 ARKANSAS 2 858 Operating
3 CALLAWAY 1235 Operating
4 GRAND GULF 1142 Operating
5 RIVER BEND 1 936 Operating
6 WATERFORD 3 1075 Operating
7 WOLF CREEK 1135 Operating