Joe, are you and Gary up to speed on this ElPaso outage on the 26th? Any
concerns on our side? Thanks. Lynn
---------------------- Forwarded by Lynn Blair/ET&S/Enron on 06/24/2001 10:=
21 AM ---------------------------
From:=09Lorna Brennan/ENRON@enronXgate on 06/22/2001 11:06 AM
To:=09John Dushinske/ENRON@enronXgate, Bill Fowler/ENRON@enronXgate, Kent M=
iller/ET&S/Enron@ENRON, Dave Neubauer/ET&S/Enron@ENRON, Sue Neville/ENRON@e=
nronXgate, Jo Williams/ET&S/Enron@ENRON, Mike Barry/Enron@enronXgate, Vicki=
Berg/ENRON@enronXgate, Sean Bolks/ENRON@enronXgate, Joni Bollinger/ENRON@e=
nronXgate, Janet Bowers/ENRON@enronXgate, Theresa Branney/ENRON@enronXgate,=
Craig Buehler/ENRON@enronXgate, Bob Burleson/Enron@enronXgate, Reyna Cabre=
ra/ENRON@enronXgate, Lee Ferrell/ENRON@enronXgate, Stephen Herber/Enron@Enr=
onXGate, Martha Janousek/ENRON@enronXgate, Tim Johanson/ENRON@enronXgate, J=
ane Joyce/ENRON@enronXgate, Karen Lagerstrom/Enron@Enronxgate, Laura Lantef=
ield/ENRON@enronXgate, Robert Mason/ENRON@enronXgate, Penny McCarran/Enron@=
EnronXGate, Vernon Mercaldo/ENRON@enronXgate, Jeff Nielsen/ENRON@enronXgate=
, Frank Oldenhuis/ENRON@enronXgate, Larry Pavlou/ENRON@enronXgate, Loren Pe=
nkava/Enron@enronXgate, John Pritchard/ENRON@enronXgate, Preston Roobaert/E=
NRON@enronXgate, Chris Sebesta/Enron@EnronXGate, Frank Semin/ENRON@enronXga=
te, Michael G Stage/Enron@EnronXGate, Bob Stevens/ENRON@enronXgate, Larry S=
wett/ENRON@enronXgate, Steve Thomas/ENRON@enronXgate, Kay Threet/ENRON@enro=
nXgate, Lisa Valley/ENRON@enronXgate, Steve Weller/ENRON@enronxgate, Chuck =
Wilkinson/ENRON@enronXgate, Lynn Blair/ET&S/Enron@ENRON, Rick Dietz/ENRON@e=
nronXgate, Steven January/ENRON@enronXgate, Sheila Nacey/ET&S/Enron@ENRON, =
Donna Scott/ENRON@enronXgate, Steven Harris/ET&S/Enron@ENRON, Lindy Donoho/=
Enron@enronXgate, Jeffery Fawcett/ENRON@enronxgate, Pallavi Goradia/ENRON@e=
nronXgate, Lorraine Lindberg/Enron@enronXgate, TK Lohman/ENRON@enronxgate, =
Michelle Lokay/ENRON@enronXgate, Jan Moore/ENRON@enronXgate, Kimberly Watso=
n/ENRON@enronXgate, Allen Cohrs/ENRON@enronXgate, John Fiscus/ENRON@enronxg=
ate, Steve Gilbert/ENRON@enronxgate, Dana Jones/Enron@enronXgate, Stephanie=
Korbelik/ENRON@enronxgate, Don Powell/ENRON@enronxgate, Ken Powers/ENRON@e=
nronxgate
cc:=09=20

Subject:=09Maintenance Notes on El Paso, ANR, NOVA, and NGPL

Transportation Notes=20
Saying linepack had stabilized, El Paso canceled an Unauthorized Overpull P=
enalty alert Wednesday, one day after it had gone into effect. The pipeline=
also said it will take Line 1100 between the Eunice and Pecos River statio=
ns down for repairs June 26. Six interconnects will be unable to deliver in=
to El Paso that day, and the total flow of gas through Eunice Station to th=
e South Mainline will be limited to 245 MMcf/d. Plants upstream of Eunice a=
nd in the Monument area will compete for space with San Juan and Anadarko g=
as moving south from Plains Station.=20
NOVA said it must reduce target linepack due to increasing soil and ambient=
temperatures and to maintenance outages. It is seeking index-based uncondi=
tional tenders through Tuesday for the firm sale of about 200,000 gigajoule=
s. Tenders may be submitted for all or some of the reduction, which will be=
accomplished through inventory transfers. The gas must be taken in more or=
less even increments over a period of up to five days starting on or about=
June 28, 2001. Call Darryn Rouillard at (403) 920-6341 for more informatio=
n.=20
ANR plans to begin maintenance Monday at its Havensville Compressor Station=
that will run through Oct. 15 and reduce Southwest Mainline capacity by ab=
out 125 MMcf/d. However, based on current flow levels the impact of the wor=
k should be minimal, ANR said.=20
Due to unexpected difficulties in operating the Bisti Station's #8 unit whi=
le the C-1 turbine at the Chaco Plant in northwestern New Mexico is out of =
service, flow from all wells in the GBISTI gathering system should remain s=
hut in until turbine maintenance is complete, El Paso Field Services said. =
The C-1 turbine is expected to return to service June 29. Operators must co=
ntact Troy Chamberlain at (505) 564-4015, Corina Veloz at (505) 599-2357 or=
the Control Center at (505) 599-2334 before turning wells back on.=20
El Paso said Wednesday evening its Guadalupe Station turbine and the #3 tur=
bine at Pecos River Station #3 turbine had tripped offline unexpectedly. Th=
e Guadalupe unit was returned to service quickly that evening, but attempts=
to restart the Pecos River unit have been unsuccessful. Capacity through P=
ecos River is limited to 840 MMcf/d until further notice.=20
NGPL reported discovery of a gas quality problem at the Transok-Bryan recei=
pt point in Bryan County, OK. NGPL is working with Transok to resolve the p=
roblem but said if it continues, NGPL may need to cut scheduled volumes at =
the point.=20