Attached please see last weeks (4/1/99) sample run results.
This weeks sample run will not take place on Thursday due to PG&E's request and will be performed on Friday the 9th instead. Should still receive the results prior to next weeks report. Started decontamination and filter change outs of the 1) inlet filter seperator at the Solexol Plant 2) both filter seperators on the discharge of the Solexol Plant 3) the filter seperator at Transwesterns PG&E measurement station. Operations and contractors are gearing up today (Thursday 4/8) to start the decontamination on the inlet filter at the Solexol plant which will set the pace for the remaining 3 seperators. Operations has been informed that PG&E will be performing a decontamination and filter change out at their filter seperator on the inlet of the PG&E Topac compressor station. This has been scheduled for April 28th.
|