![]() |
Enron Mail |
Mike
We completed decontamination of the inlet filter at the selexol plant today. It was dirty but no liquid. There was some dried sludge in the bottom of the vessel and the filters were extremely dirty. We plan to do both of the filters on the discharge side tomorrow.I got a phone messsage from Jeff and he hasn't heard anything from PGE since the letter was sent . We will plan to bypass and clean the filter on the west side of the river, last one on our system Saturday unless we hear something different tomorrow. We will notify the PGE operators of their plant tomorrow of our plans.If anyone needs to contact me my pager number is 1-800-921-9564 and office phone number is 505-260-4003. Leave a message on the office phone and it will automatically page me. I'll give everyone an update late tomorrow. We should have the hot tap valves on location tomorrow for the selexol injection. We plan to install the valves as soon as they arrive. Thanks RJ By the way Bisti came on line today and they plan to run it tonight and be back on location to check on the unit tomorrow.
|