Larry,

I gave the tree issue at Station 2 some thought and I have a couple of
concerns regarding the environmental report. The report is being written,
based on the fact that all construction will occur within the station yard
and on previously disturbed ground. If we impact areas (even within
existing facilities) that were not previously disturbed we are required to
include environmental data about those areas.

So the first question is whether the entire station yard has been
"previously disturbed". To help determine this, I downloaded a USGS aerial
(1996) of the station from the internet and the trees occurring within the
station yard look to be the same age/size as those surrounding the station.
This would indicate that the areas within the station covered with trees
have not been "previously disturbed". A copy of the aerial is attached.

However, it is conceivable that the site was cleared prior to initial
construction and the trees simply grew back. Unfortunately, I don't have
that information and don't know if you do either. And let me point out that
my concern is not whether Transwestern will receive approval to construct,
but the amount of information supplied in the report. I want to feel
comfortable that we are supplying the required information to FERC.

For this project, that would primarily include a description of the existing
vegetation and soils (resource report 3 and 7). All we would really need is
a brief description of the existing vegetation and soils, and how much will
be permanently impacted, etc. However, we did not budget any time to obtain
this information, nor did we anticipate the need for site visits.

My hope is that we can find an answer to whether the site was previously
disturbed or not. If not, I hope to come up with some verbiage that
everyone is comfortable with to satisfy the FERC requirements. Otherwise,
we will have to obtain the necessary information, and that's beyond our
initial scope.

If you have had any biological reports done for the area on other projects,
that may provide enough information. Again, it only needs to be brief.
Also, we need to verify for the other 3 stations that we are constructing in
previously disturbed areas.

Lastly, Arnold has indicated that the hydro-test water will come from
existing water source at each station and that it will be discharged under
Transwestern's blanket permit. Please verify...and I think we should
provide a copy of the blanket permit with the filing.

After you have had a chance to think about this, please call and we can
discuss.

Terry.

<<Station 2 aerial.jpg<<


**********************************************************************
The information contained in this communication is confidential and
privileged proprietary information intended only for the individual
or entity to whom it is addressed. Any unauthorized use, distribution,
copying or disclosure of this communication is prohibited.
If you have received this communication in error, please contact the
sender immediately.

It is our policy that e-mails are intended for and should be used for
business purposes only.

This footnote also confirms that this email message has been swept by
MIMEsweeper for the presence of computer viruses.

ENSR
www.ensr.com
postmaster@ensr.com
**********************************************************************

- Station 2 aerial.jpg