Larry- Please review the PM lb/hr limits and the annual test for both the
turbine and the generator at the Kingman station. Let me know if you have any
problems, otherwise i will try to get the permit issued tomorrow, if not
today. The Director, Nancy Wrona, has to sign off, so i have to try and get
into her calendar.

Thanks. Shudeish

The changes i made are:-

KINGMAN
1. Attachment A header- "Attachment A below shall replace ......"

2. Attachment B. Added condition VI.C. Particulate matter. This specifies the
lb/hr limit and annual testing for PM that was requested by EPA.

3. Attachment B. Added conditon VI.E. General provision requirements from
NSPS 60, Subpart A.

4. Attachment B. Condition VII.A.1.a. Replaced previous AAC R-18-2-719(C)(1)
limit with the EPA recommended limit.

5. Attachment B. Condition VII.D.2. Added testing requirement for generator.

6. Tech review, Table 3.3. Added footnote 2 to incorporate EPA's comment.

7 Tech Review document, Section V.B.1. Corrected the PM limit for the engine.

FLAGSTAFF
1. Attachment A header- "Attachment A below shall replace ......"

2. Attachment B. Added conditon VI.D General provision requirements from NSPS
60, Subpart A.

3. Tech review, Table 3.3. Added footnote 2 to incorporate EPA's comment.

4.Tech Review document, Section V.B.1. Corrected the PM limit for the engine.

- Per1601.wpd
- Tech1601.wpd
- Per1602.wpd
- Tech1602.wpd