"Kirkpatrick, Joe" <joe.kirkpatrick@nrgenergy.com< writes to the
NYISO_TECH_EXCHANGE Discussion List: Is evening load pick up a security issue or an economic issue? Loading a Gilboa to peak shave is outside of the market rules. There are other bids that should have been accepted prior to this control action. 27-Nov-2000 15:45:59 ISO REQUESTS GILBOA___4 OUT OF MERIT FOR ISO SECURITY. EVENING LOAD PICK UP AT 16:00 11/27/00 If the NYISO is under generated due to load pick up why are GTs not dispatched instead of loading generation out-of-merit. If the NYISO is loading Gilboa to satisfy 10 min spinning reserve why are not 10 min non-spin generators or 30 minute non-spin generators dispatched prior to dispatching generation out-of-merit. Both 10 minute and 30 minute non-spin generators if generated could be generated displacing 10 spinning reserve negating the need to dispatch Gilboa out-of-merit. As always due to limited info available conclusions are drawn based on info available. If more info is available please post it. Thanks Joe
|