Hey Guys,
We have been researching PJM transmission settlement and have found an inconsistency in how deals are settled in PJM and how they are getting into Enpower. I would like to propose that any deal for transmission be entered into Enpower as documented below. Please come to me if you have any questions. Volume Management is attempted to set up a process to reconcile these volumes on a daily and monthly basis, so bear with us until the process is in place and everyone is up to speed. Thanks, Rebecca PJM TRANSMISSION PROCEDURE Every time an OASIS request is accepted in PJM a deal is entered into Enpower... 1) with a demand volume equal to the amount reserved 2) demand price of $0.67 3) trans volume equal to the volume FLOWED (or expected to flow) 4) trans price of $0.48 5) Comments with the PJM OASIS number for reference (buy and sell transaction ids if available) Examples: A) If EPMI reserve 100mw of transmission on peak for the whole month, but we are not sure if or when we are going to use it, enter demand volume of 100mw and trans volume of zero, and then when it is used change the trans volume in Scheduling to the amount that actually flowed. B) If EPMI reserves 50mw for HE8-12 and expects to use it, enter demand volume of 50mw and trans volume of 50mw, and then of it is cut change the trans volume in Scheduling to the amount that actually flowed.
|