Subject:Weekly Activity Report-Roswell Area
Cc:
Bcc:
Date:Thu, 1 Jun 2000 03:47:00 -0700 (PDT)

Received the "permit by rule" approval for the turbine power unit changeout
for the Keystone C/S.

The emissions testing results for the Plains Turbine Station was submitted to
the TNRCC.

Discharge renewal applications for C/S No. 9 and Monument Turbine C/S were
submitted to the OCD.

Notification to the New Mexico AQB was given for the power turbine changeout
at the Atoka No. 2 C/S.

One employee was skill verified for level II environmental

During the routine weekly sampling of the PG&E system, it was discovered that
approx. 3 oz of liquid had collected in the new filter separator in the PG&E
C/S yard. A request was made to analyze the liquid for not only PCB's but
also pH to determine if the liquids resulted from the caustic and water
cleaning of the upstream portion of the pipe leading into the PG&E C/S .
This is the first occurance of liquids at this location since this new filter
separator was installed and put inot service.