A meeting was held with the Roswell Team at C/S No 8 discuss roles and
responsibilities of the Title V Operating Permit for the Corona C/S.

The sale of the TW Crawford C/S has been cancelled. A permit revision was
requested to the Air Quality Bureau to transfer the new permit to the
existing facility to keep intact the ability to conduct turbine power unit
replacements without agency notification.

Preparations are in place for the forthcoming meeting between PG&E and
Transwestern over PCB issues on their mainline. Analytical shows that the
PCB's are continuing to move further downstream into their system. Ralph
Komai, with SoCal, will make a presentation concerning SoCal's experience
with PCBs on mainline and LDC systems and present it during the 4/20 meeting
in San Francisco.

The annual certification for the Atoka No. 3 C/S was reveiwed for completion
and submitted to M. Nelson for signature.