A meeting was held with the Roswell Team at C/S No 8 discuss roles and
responsibilities of the Title V Operating Permit for the Corona C/S. The sale of the TW Crawford C/S has been cancelled. A permit revision was requested to the Air Quality Bureau to transfer the new permit to the existing facility to keep intact the ability to conduct turbine power unit replacements without agency notification. Preparations are in place for the forthcoming meeting between PG&E and Transwestern over PCB issues on their mainline. Analytical shows that the PCB's are continuing to move further downstream into their system. Ralph Komai, with SoCal, will make a presentation concerning SoCal's experience with PCBs on mainline and LDC systems and present it during the 4/20 meeting in San Francisco. The annual certification for the Atoka No. 3 C/S was reveiwed for completion and submitted to M. Nelson for signature.
|