Calvin - thanks for explaining the situation at SJSU. Steve Krein, our
metering expert and the architect of the meter installation at SJSU, mentioned that there currently is no extra phone line so yours will have to be a new, additional one. Further, as PG&E insisted on the bi-directional meter, PG&E ought to pick up the incremental cost of that device versus a standard meter. Then, once the PG&E meter has been installed (Steve thinks there is a meter location left on the board), we will need to reprogram the meter for which PG&E will be charged. In light of all of this effort, couldn't PG&E relent and accept the Enron IDS files? This appears to be an uneconomic investment. Dirk A.van Ulden (925) 543-3879 Fax (925) 543-3550 Dirk_vanUlden@enron.com
|