Enron Mail |
Attached is the prehearing conference statement issued by PG&E in the =20
Transmission OII proceeding.? The utility suggests that there are no =20 projects which should be considered.? Their direct quote is: ? "...it does not appear that PG&E has any transmission projects appropriate= =20 for inclusion in this fall=01,s hearings.? While the Los Banos-Gates 500 = kV=20 Transmission Project (the =01&Path 15 Project=018) raises issues of statew= ide=20 importance and has progressed to the point where a preferred route has bee= n=20 identified and a detailed cost estimate prepared, that project is the=20 subject of a pending conditional CPCN application (A.01-04-012).? There is= =20 no need for the Commission to conduct a duplicative analysis of the Path 1= 5=20 project as part of the instant investigation.? The only other transmissio= n=20 projects PG&E currently plans that may require a CPCN =01) the Vaca-Lakevi= lle=20 230 kV Project in Sonoma and Napa Counties, the Jefferson-Martin 230 kV=20 project in San Francisco, the Fresno Long-Term project, and the Bay Area 5= 00=20 kV substation project =01) are all longer-term, locally- or regionally-foc= used=20 projects not planned to be operational until 2004, 2005, 2006, and 2007,= =20 respectively." ? Dan Law Offices of Daniel W. Douglass 5959 Topanga Canyon Blvd.? Suite 244 Woodland Hills, CA 91367 Tel:?? (818) 596-2201 Fax:? (818) 346-6502 douglass@energyattorney.com - PHC Stmt_07_03_01.doc
|