Enron Mail |
A hour ahead 24 has been sent to the ISO for 10.10.01.
HE 13-20 APX1 SP15 purchase increased by 25 MW STCA SDG1 load decreased by 25MW This was due to a scheduling problem which occurred with BPs (SC ID APX1) sale to STCA on 10.09.01 They preferred to schedule their sale hour ahead and we have agreed. This will be a one time arrangement. Thanks, Serena
|