![]() |
Enron Mail |
The MTBE plant went down about 1 a.m. on Saturday morning, May 20, as a
result of power failure. Apparently lightning knocked out the power substation. The oleflex is starting up, along with the MTBE plant, and butamer. Some production is expected tonight with full rains possibly attained tomorrow.
|