Enron Mail

From:vance.taylor@enron.com
To:robert.cotten@enron.com
Subject:Re: Basin Production from GA 213
Cc:daren.farmer@enron.com, julie.meyers@enron.com, cynthia.hakemack@enron.com,lisa.hesse@enron.com, susan.smith@enron.com, donald.reinhardt@enron.com, melissa.graves@enron.com
Bcc:daren.farmer@enron.com, julie.meyers@enron.com, cynthia.hakemack@enron.com,lisa.hesse@enron.com, susan.smith@enron.com, donald.reinhardt@enron.com, melissa.graves@enron.com
Date:Fri, 9 Feb 2001 07:40:00 -0800 (PST)

Bob,

As mentioned earlier, Houston Exploration is also delivering gas to us at
this meter. The following production is now on-line and a ticket should be
created and entered into sitara based on the following:


Counterparty Meter Volumes Price Period
Houston Exploration 9696 8000mmbtu/d 100% GD less $0.16 2/1 - 2/28

FYI, I will create and submit a committed reserves firm ticket if and when
the gas buyer terms the deal up. Additionally, this is a Producer Svcs. deal
and should be tracked in the IM Wellhead portfolio... attached to the
gathering contract.

Thanks,

vlt
x3-6353
---------------------- Forwarded by Vance L Taylor/HOU/ECT on 02/09/2001
02:46 PM ---------------------------

Enron North America Corp.

From: Robert Cotten 01/26/2001 08:47 AM


To: Daren J Farmer/HOU/ECT@ECT
cc: Vance L Taylor/HOU/ECT@ECT
Subject: Re: Basin Production from GA 213

Daren/Vance,

Deal # 586954 has been created and entered in Sitara:

Date Meter # Volume Price

2/1/01 - 2/28/01 9696 5,000 100% Gas Daily less $0.16

Bob




Daren J Farmer
01/26/2001 08:25 AM
To: Robert Cotten/HOU/ECT@ECT
cc:
Subject: Re: Basin Production from GA 213


---------------------- Forwarded by Daren J Farmer/HOU/ECT on 01/26/2001
08:24 AM ---------------------------


Vance L Taylor
01/25/2001 01:58 PM
To: Daren J Farmer/HOU/ECT@ECT
cc: John Peyton/HOU/ECT@ECT
Subject: Re: Basin Production from GA 213

Daren,

I've just received word from Basin to bring production on sometime today or
tomorrow (they expect to get up to b/t 10,000-15,000d); if our facility
planning engineer determines that we can take the gas, then it will flow for
all of February and be priced at 100% Gas Daily less $0.16.

vlt



Daren J Farmer
01/25/2001 01:47 PM
To: Vance L Taylor/HOU/ECT@ECT
cc:
Subject: Re: Basin Production from GA 213

I need for you, or the Producer Services group, to determine if you think the
gas will flow for the month and at what price. I will use your decision for
our bidweek postion.

D



Vance L Taylor
01/25/2001 11:53 AM
To: Daren J Farmer/HOU/ECT@ECT, Robert Cotten/HOU/ECT@ECT
cc: Susan Smith/HOU/ECT@ECT, Melissa Graves/HOU/ECT@ECT
Subject: Basin Production from GA 213

FYI,

How would you want to handle for February nomination?

vlt
x3-6353
---------------------- Forwarded by Vance L Taylor/HOU/ECT on 01/25/2001
11:55 AM ---------------------------

Enron North America Corp.

From: Brad Blevins 01/25/2001 10:56 AM


To: John Peyton/HOU/ECT@ECT
cc: Nick Cocavessis/Corp/Enron@ENRON, Steve -HPL- Schneider/HOU/ECT@ECT, Pat
Flavin/GCO/Enron@Enron, Vance L Taylor/HOU/ECT@ECT, Buck
Thomas/GCO/Enron@ENRON
Subject: Basin Production from GA 213

I have reviewed the gas composition analysis from SPL of the Basin production
from GA 213. While SPL's analysis does show a dewpoint of around 20 degrees
F at 400 psig, it is both my and John Handley's opinion that the gas from the
wellbore had stratified by the time that this sample was taken. We expect
the dewpoint of the flowing gas to be higher. However, this was the best
sample that could be obtained at the time. We have conferred with Steve
Schneider and we are willing to take this gas on a conditional basis over the
next couple of days. Once the 6" line has been pigged, the production flows
stablilized and Mitchell's conditioning equipment lined out over the next
couple of days, HMS will need to take another sample at the meter run and
have SPL run an extended analysis with a dewpoint curve on an expedited
basis. Should this sample indicate a dewpoint over 45 degrees F, then this
production will be shut in again until hydrocarbon dewpoint conditioning
equipment has been installed. In the meantime, HMS needs to keep a close
watch on all Southern Union city gates on Galveston Island to monitor for
liquids fallout.