![]() |
Enron Mail |
Based on the conversation we had at the meeting last Thursday, I am
implementing the following changes to Humble Gas Pipeline and King Ranch Gas Plant. If you disagree or feel you had a different understanding than the items below, please be sure to call me asap. 1. Input HPLC purchase from HPLR Liquids at meter 8793 (HPL/HGPL). Remove the 3 Rivers gas from the Interconnect ticket and input on the Purchase Deal. 2. Input HPLC sale to HPLR Liquids at meters 9643 (KGPL/HPL) and 12 (KGPL/HGPL). Remove 3 rivers volumes from the interconnect tickets at these meters and input on the sales Deals appropriately. 3. Change swing parameters for the King Ranch contracts to swing on Cage Ranch before swinging on 3 Rivers Gas. This will hopefully allow the sale for 3 Rivers gas to remain at one meter as much as possible. I will hopefully have all of these changes made by the end of the day, and have all contracts repathed. It is my understanding that we are implementing these changes effective Feb. 1st. Stella, This may or may not effect repathing of the HPLC gas at meter 9643, based on the swing parameters that you have been using. Thank you.
|