Enron Mail |
Mark:
As per our phone conversation, please generate these two bin-averaged power curves for turbine #2 at Montfort. 1) Consider all data from the month of February 2) Consider data only from Feb. 9 to the end of February Please use 0.5 m/s bins. The prefered output for this work is a single plot showing both power curves. Getting these results by the end of this week would be perfect. Thanks, Philippe
|