![]() |
Enron Mail |
Chris--So as not to delay things more than I already have, the table below
shows our March '00 Requirements on AGL by pipeline. I will put these values into the spreadsheet that I sent earlier, but this will give you an idea of what the numbers look like. The above values for storage withdrawals assume that we are maximizing the withdrawals from the so-called "Directly Assigned Storage" that ENA schedules on our behalf. I believe that notwithstanding the above storage withdrawal values, we will still have storage inventory left at the end of March since our withdrawals to date have been so low. Both the Storage withdrawals shown above and the Flowing gas should flow on Primary firm capacity since we have been assigned this capacity by AGL. The above numbers also assume that we will be maximizing our withdrawals of AGL's IBSS (Incremental Bundled Storage Service) during March. The IBSS withdrawals are not included in the storage withdrawal volumes shown above, since we schedule the IBSS ourselves at AGL's citygate. Please call me if you have questions and I will be forwarding you a final copy of the spreadsheet with these numbers in a short while. Sorry for the delay! Doug Kinney Ph: 703-561-6339 Fax: 703-561-7317
|