![]() |
Enron Mail |
June nomination into the pool should have been 500 Mcfd of production gas
(from Phillips) and 7,500 Dth of pool gas from Power Gas Marketing. You should check with Heidi Boyd @ CES for the actual noms into the pool. She should have nominated these volumnes into CES's pool since ENA does not have a pool. As far as I know, the pool to pool transfer fee is $0.04/Dth or $100.00 which ever is LESS. Therefore, for volumes over 2,500 the transfer fee should be $100.00 no matter what the volume is. Phillips' contract for 500 MCFD metered production goes through NOVEMBER (this volume may be less because of high line pressures). Power Gas Marketing's contract for 7,500 Dth /Month pool to pool goes through OCTOBER. If Clinton is interested in the volumes through contract expiration, I can ask Phillips to grant us permission to move the meters into Clinton's pool. John Chris Germany@ECT 05/31/2000 04:16 PM To: John M Singer/Corp/Enron@ENRON cc: Subject: Re: PNG Production I'm chating with Clinton about this gas. Is it 500 dth per day or 500 mcf per day? Also, does he have to take this from our pool where we pay $.08 per dt or can we give him metered production? From: John M Singer @ ENRON 05/30/2000 01:01 PM To: Chris Germany/HOU/ECT@ECT cc: Subject: PNG Production I ask Heidi Boyd to reduce the May production noms from 800/day to 500/day. I ask here to nominate 500/day for June. I was unable to sell any PNG to Amerda Hess (StatOil), therefore we will be cashed out by PNG for June. John
|