Enron Mail |
AGL has posted their September LSR details, so attached is the revised FOM
numbers. Also, on TCO 23-5 (COH) there were 7 mmbtu shown as separately priced: per Doug Kinney that deal is not being assigned to New Power, so while the required volume isn't changing, the net volume at FOM price goes up by 7 mmbtu. (I took the 7 to 0) Christina and Scott, I've also attached a preliminary AGL sheet for 9/1 so you can begin to assign contract numbers. David
|