OUTAGE REPORT FOR GATHERING Received 4/3/2000 2:35 p.m.
Posted 4/3/2000 2:35 p.m. STATE: PA FACILITY: Cherry Tree Station PLANNED WORK: Overhaul Unit #2 OUTAGE DATE: April 10-20 FLOW REDUCTION: 2.4 MMCFD CONTACT: Kevin Miknis STATION PHONE: 724-468-3731 STATE: PA FACILITY: Stoney Run Station PLANNED WORK: Overhaul Unit #3 OUTAGE DATE: April 24 - May 5 FLOW REDUCTION: 2.0 MMCFD CONTACT: Kevin Miknis STATION PHONE: 724-468-3731 STATE: WV FACILITY: Jones Station PLANNED WORK: Overhaul Unit #1 OUTAGE DATE: April 17-20 FLOW REDUCTION: 1.0 MMCFD CONTACT: Larry Wade STATION PHONE: 304-477-3366 FACILITY: TL-263 PLANNED WORK: Replacement tie-ins OUTAGE DATE: April 15 FLOW REDUCTION: 34.0 MMCFD CONTACT: Steve Searls STATION PHONE: 304-595-1270 Notice to all Appalachian Pool Operators: Received 3/29/00 2:00 pm Reclassification Notice Posted 3/29/00 2:00 pm On February 10, 1999, the FERC approved Docket No. CP97-549, granting CNG Transmission's (CNGT's) request for reclassification of various transmission lines to gathering lines. As part of that Docket, several transmission lines were denied to gathering. On March 12, 1999, CNGT filed for rehearing to further support the reclassification of the lines denied reclassification. On March 21, 2000, the FERC approved Docket No. CP97-549-001, granting reclassification of five lines from transmission lines to gathering lines. The newly reclassified gathering lines include: D-2149, H-19921, LN-943, H-124 and H-21777 south of Bradley Compressor Station. On March 22, 2000, CNGT filed new tariff sheets to implement the reclassification effective April 1, 2000. Although the FERC has not yet granted approval of the tariff sheets, CNGT is notifying producers that upon approval of the new tariff sheets, CNGT will begin charging a gathering rate of $0.198/Dt. and a fuel retention of 2.28% for all gas moved on the lines listed above. If you have questions regarding this notice, please contact Nancy Aucremanne at (304) 623-8698 or Celesta Miracle at (304) 623-8262. April 3, 2000 Received 4/3/00 11:10 am Posted 4/3/00 11:10 am Dear Pool Operator: CNG Transmission Corporation (CNGT) plans to take its Hastings Extraction Plant (H.E.P.) out of service to perform annual maintenance starting at 12:01 a.m. on Tuesday, September 12, 2000. This requires that the "wet gas" system behind the H.E.P. in West Virginia be shut in. The plant shutdown will last approximately twenty-one (21) days if no unexpected problems arise during the shutdown. Normal plant operations are scheduled to resume on Tuesday, October 3, 2000. All questions concerning the shut in and the subsequent turn in should be directed to CNGT's local operations supervisor in the production area. Unless other arrangements have been made to move gas to markets other than on CNGT, all wet gas production must be shut in by 5:00 p.m. on Monday, September 11, 2000. This will allow our compressor stations to pull down the field pressure prior to going completely down at midnight and will ensure that we maintain the time-lines on our schedule. As per CNGT's tariff, failure to shut in by 5:00 p.m. will result in CNGT considering the gas to be unauthorized and it will not be credited as a delivery to your pool. As the exact time the plant will resume service is very difficult to determine, and in an effort to minimize confusion, producers in your pool will need to coordinate the turn in of their production with CNGT's local operations supervisor. We are also asking that all pool operators notify producers in their pool of this shut in. CNGT will not notify producers individually. We appreciate your cooperation and assistance on this. I also wanted to you to know that we are attempting to complete all work necessary for us to avoid shutting down the plant next year. The next regularly scheduled shut down will not be until 2002. If you have any questions about this letter, please feel free to contact me at (304) 623-8698. Sincerely, Nancy M. Aucremanne Manager, Producer Services And Business Agreements ANNUAL FACILITY OUTAGE SCHEDULE Received: 3/31/00 1:10 pm April 1, 2000 through March 31, 2001 Posted: 3/31/2000 1:10 pm Facility: Leesburg Down Time: 3 Days Out of Service Date: April ? Back in Service Date: April ? Reason for outage: Service Filter Seperator. Remarks: ************************************************************** Facility: Chambersburg Down Time: 1 Day Out of Service Date: April ? Back in Service Date: April ? Reason for outage: Service Filter Seperator. Remarks: *********************************************************** Facility: Sweeney Station Down Time: 2 months Out of Service Date: June 1 Back in Service Date: August 1 Reason for outage: Automation of Engines (Will not effect customers) Remarks: ************************************************************** Facility: Cornwell - Unit #9 Down Time: Unknown Out of Service Date: ? Back in Service Date: ? Reason for outage: Foundation Replacement, 8000 hr. inspection, general maint. Remarks: ************************************************************** Facility: Cornwell (Entire Station) Down Time: 1 Day Out of Service Date: September ? Back in Service Date: September ? Reason for outage: Test Emergency Shutdown Remarks: ************************************************************** Facility: Cornwell #8 Unit Down Time: 2 weeks Out of Service Date: 9-11 Back in Service Date: 9-25 Reason for outage: 24000 hr inspection Remarks: ************************************************************** Facility: TL406 Down Time: 1 Month Out of Service Date: 5-1 Back in Service Date: 5-31 Reason for outage: Installation launcher/receiver and new gate valves Remarks: ************************************************************** Facility: TL378 Down Time: 6 Days Out of Service Date: June ? Back in Service Date: June ? Reason for outage: Replace road crossing. Remarks: ************************************************************** Facility: South Bend Station Down Time: 6 Days Out of Service Date: June ? Back in Service Date: June ? Reason for outage: Install new fuel filter Remarks: ************************************************************** Facility: Washington #2 Down Time: 5 Days Out of Service Date: 4-10 Back in Service Date: 4-14 Reason for outage: Remarks: ************************************************************** Facility: Washington #1 Down Time: Currently Out of Service Date: ? Back in Service Date: ? Reason for outage: Engine Inspection Remarks: ************************************************************** Facility: Groveport #1 Down Time: 12 Days Out of Service Date: 4-17 Back in Service Date: 4-28 Reason for outage: General Maintenance (Main Unit) Remarks: ************************************************************** Facility: Groveport #3 Down Time: 5 Days Out of Service Date: 5-1 Back in Service Date: 5-5 Reason for outage: Shutdown/Engine Inspection. Remarks: ************************************************************** Facility: Groveport #1 Down Time: 5 Days Out of Service Date: 5-15 Back in Service Date: 5-19 Reason for outage: General Maintenance-Compressor Remarks: ************************************************************** Facility: Groveport #2 Down Time: 5 Days Out of Service Date: 6-5 Back in Service Date: 6-9 Reason for outage: General Repairs.. Remarks: ************************************************************** Facility: Groveport #3 Down Time: 12 Days Out of Service Date: 8-7 Back in Service Date: 8-18 Reason for outage: General Maintenance (Turbo Charger) Remarks: ************************************************************** Facility: TL400 Down Time: 4 to 5 Days Out of Service Date: June Back in Service Date: October Reason for outage: Road-crossing. Remarks: ************************************************************** Facility: Line 546 Down Time: ? Out of Service Date: June Back in Service Date: June Reason for outage: Pigging preparations (Effect North Sheldon/Marilla) Remarks: ************************************************************** Facility: DeRuyter M&R Down Time: 5 Days Out of Service Date: 6-10 Back in Service Date: 6-14 Reason for outage: Replacement of measurement. Remarks: ************************************************************** Facility: LN-536 Down Time: 12 Days Out of Service Date: 6-19 Back in Service Date: 6-30 Reason for outage:Replace 200 ft of pipe. Remarks: ************************************************************** Facility: LN-30 Down Time: 12 Days Out of Service Date: 8-7 Back in Service Date: 8-18 Reason for outage: Installation launcher/receiver Remarks: ************************************************************** Facility: Newfield M&R Down Time: 19 Days Out of Service Date: 7-10 Back in Service Date: 7-28 Reason for outage: Rebuild entire station Remarks: ************************************************************** Facility: Freeville M&R Down Time: 5 Days Out of Service Date: 6-12 Back in Service Date: 6-16 Reason for outage: Replace Heater Remarks: ************************************************************** Facility: TL-342 Down Time: 1 Day Out of Service Date: September ? Back in Service Date: September ? Reason for outage: Longwall Mining Repairs (Will not effect Customers). Remarks: ************************************************************** Facility: Hastings Extraction Plant Down Time: 21 Days Out of Service Date: 9-12 Back in Service Date: 10-3 Reason for outage: All Wet Production Shut-In Remarks: ************************************************************** Facility: LN-264 Down Time: 19 Days Out of Service Date: 7-3 Back in Service Date: 7-21 Reason for outage: Pipe replacement. (All wet production south of Jones Station) Remarks: ************************************************************** Facility: TL-422 Down Time: 19 Days Out of Service Date: 7-3 Back in Service Date: 7-21 Reason for outage: Pipe replacement. Remarks:. *************************************************************** Note: Throughout the spring and fall, we will be conducting various shut-in tests, maintenance, and repairs on our storage pools. While we will make every effort to mitigate the effect of these tests, they could have some effect on our overall operations.
|