Enron Mail |
Attached to this email is four files:
CSC Meeting Agenda.doc CSC2001Analysis.zip - Zip Compressed Excel Workbook 01sum1sav.zip - Zip Compressed Load Flow Base Case PTI PSSE 26.2 SAV format 01sum1raw.zip - Zip Compressed Load Flow Base Case PTI PSSE 26.2 SAV format ERCOT System Planning has prepared calculations and data to support the identification of Commercially Significant Constraints (CSC). A meeting to discuss these calculations with stakeholders will be held: Wednesday, January 31 9:30 AM to 3:30 PM Red Lion Hotel in Austin (I35 & 290) The goal of this meeting is to identify which transmission system contingencies and limiting elements are commercially significant. After CSC's are determined at this meeting, ERCOT will develop a recommendation and present it to TAC at their February 7 meeting. We have also set up an email account to receive comments. Its email address is csccomments@ercot.com it will be available throughout this process to receive comments and input. Kenneth A. Donohoo, PE Manager of System Planning, Technical Operations ERCOT 2705 West Lake Dr. Taylor, TX 76574-2136 (512)248-3003, FAX(512)248-3082 - CSC Meeting Agenda.doc - CSC2001Analysis.zip - 01sum1sav.zip - 01sum1raw.zip
|