![]() |
Enron Mail |
Stan - FYI, we (Ron, John, Rod, Saeed and Dwight) had a great meeting today
with PWC to discuss getting a better handle on both the operating synergies and growth potential for a combination pipes/wires Transco. They had a very good outline of how to move forward at a 50,000 foot level, which is appropriate for our next meetings on 2/1/ and 2/4. The action items resulting were as follows: ENE to provide PWC w/ basic data download from our work in progress (assumptions we've used for the IOU's assets, GPG public data, shell models, etc.) (1/21) PWC to provide ENE cost to complete study prior to 2/1 and 2/4 meetings (1/21) PWC to provide ENE a template for evaluating each of the synergies we mutually agreed need focusing on now. (1/24) PWC to provide ENE a similar template for the various growth prospects discussed (1/24) Initial follow up meeting (same participants from ENE) on Monday, 1/24 to begin rationalizing the data and quantifying the numbers. Rough draft of study due before 2/1 meeting. Final draft prior to 2/4 meeting. As always, call if any questions. RANDY
|