Dan,
Here is the scope of the deal with Citizens Utilities, there are a couple of things we will have to mention in the contract that are not addressed in this letter: 1) That all load balancing will be handled by injection and withdrawal from storage, and that these incremental costs (i.e. variable charges) will be paid by Citizens. 2.) I need to work out a predetermined load profile with Citizens, and that profile will need to be in the contract. This load profile will be used as a guide and the contract language will need to be able to accommodate nomination changes on a daily basis, at our discretion. I'm sure you will need further explanation, so feel to call me. Thanks again for all you help. Paul (303) 575-6474
|