![]() |
Enron Mail |
Credit will be sending you a worksheet and the delivery point is 8078 on HPL
Maximum should be 1,000 mmbtu/d Dan J Hyvl 08/09/2000 08:46 AM To: Gary W Lamphier/HOU/ECT@ECT cc: Subject: Re: Rhodia Where's the Delivery Point? Has Credit prepared a worksheet for the Contract? If not, please contact them so that I can input it into the Contract Draft. Volumes are to be total fuel requirement up to a max of ___. Gary W Lamphier 08/08/2000 03:50 PM To: Dan J Hyvl/HOU/ECT@ECT cc: Subject: Rhodia Dan, Need to prepare a contract for Rhodia. Term: September 01, 2000 for three years Price: IF-HSC +.08 Address: Rhodia Inc. 259 Prospect Plains Road CN 7500 Cranberry, NJ 08512-7500 Attention: John Rhodes (609) 860-3284 (609) 860-8562 fax john.rhodes@us.rhodia.com Agent: Summit Energy Susan Spalding (502) 429-3800 sspalding@summitenergy.com Flexible pricing, change force majeure to longer than 60 days, define firm gas, no minimum volume on triggering; were there concerns. I want to e-mail one to Susan, get it approved and then prepare written documentation. Thanks, Gary
|