![]() |
Enron Mail |
The original schedule was 50 MW's TEP GEN @PV(EPE XCHANGE) - EPMI -
SRP-MIRANT-CISO(T)PVD/SP15. Mirant was cut by the CISO 3 mw HE 6, and 4 mw HE 24. Please refer to Mirant tag #3205 for this revised schedule. Mirant is sending the schedule real time. I spoke with TEP and they are aware of the change. Thanks Stacy
|