![]() |
Enron Mail |
Attached please find the most recent version of the LV Cogen/ABB
Agreement (second document below) that incorporates the contractor's comments and those received from Don Hammond, as well as a blackline (first document below) showing changes from the version attached as Exhibit N-4 to the EPC Contract. Sorry for the delay in making the changes. The document that was attached as Exhibit N-4 to the EPC Contract was not on our system. Apparently, some revisions had been made to the version I had circulated on 1/8/01, but were not done by A&K (although the revised document kept the same document number as the 1/8/01 draft. As a result there was some confusion over what changes should be made or had been made. Since Enron and the contractor were working off the document attached as Exhibit N-4 to the EPC Contract, that is the version I made the changes on and ran the blackline against. I will be in all day Friday if any further changes need to be made. <<Comparison of LV Cogen ABB Agt - Version 1 to 2.DOC<< <<LV Cogen/ABB Agreement.DOC<< - Comparison of LV Cogen ABB Agt - Version 1 to 2.DOC - ABB Agreement.DOC
|