I've renegotiated the 400,000 MMBtu/day supply area deal on NGPL. The
primary delivery points have not changed. The new (receipt) paths, volumes
and rates are below. I'll forward the actual receipt points along with the
amended contract once complete. Essentially, this new structure
significantly reduces our commodity costs to points west of 346 and slightly
reduces (50%) commodity costs east of 346. Please remember that secondary
deliveries to points east of 346 (with the exception of Sonat Erath) still
include a volumetric (demand) adder $0.02 Dth for STX receipts and $0.025 for
all other receipts. Deliveries to Sonat Erath will be an additional $0.02
MMbtu. Let me know if you have any issues ASAP. I want to make this
effective August 1.