![]() |
Enron Mail |
Please review the attached and lets discuss.
---------------------- Forwarded by Gerald Nemec/HOU/ECT on 04/18/2000 02:3= 5=20 PM --------------------------- Robert D Morgan 04/18/2000 12:12 PM To: Gerald Nemec/HOU/ECT@ECT cc: Brian M Riley/HOU/ECT@ECT=20 Subject: Interconnect Agreement In the short-term, I need two agreements: 1) A delivery point from LRC to SkyGen Energy LLC at the Cosmar plant in= =20 Ascension Parish, La. Bridgeline Holdings will install, own, and operate= =20 5369' of 8" and the 100MM/D measurement station. Next week would be okay. 2) A bi-directional point between HPL and Tejas. The details are still bei= ng=20 negotiated. If possible, I would like it Wedesday EOB. Item Install Own Operate 11mile of 16 Header Tejas Tejas Tejas 12 on 30 Hot Tap for Texoma HPL HPL HPL 1600=01, of 16 between Texoma and M&R Tejas HPL HPL Check Measurement (Flow Computer, SCADA) Tejas Tejas Tejas OPP to protect HPL Tejas HPL HPL Custody Measurement Tejas HPL HPL Flow/Pressure Control Tejas HPL HPL Over-Ride Control Tejas Tejas Tejas Easement for Hot Tap Tejas HPL HPL ROW for 1600' Tejas HPL HPL Easement for Measurement Tejas HPL HPL
|