The detail that we currently have on the interconnect for Mary Jo Johnson.


---------------------- Forwarded by Gerald Nemec/HOU/ECT on 09/15/99 04:35 PM
---------------------------
From: Chris Sonneborn on 09/15/99 04:21 PM
To: Gerald Nemec/HOU/ECT@ECT
cc:
Subject: Spanish Camp to Mobil Vanderbuilt 14-inch interconnect

Gerald -

Here is a copy of the scoping document that I passed along to Glenn Gregory.

Thanks,
Chris Sonneborn
---------------------- Forwarded by Chris Sonneborn/HOU/ECT on 09/15/99 04:17
PM ---------------------------
From: Chris Sonneborn on 09/13/99 03:51 PM
To: Glenn Gregory/GCO/Enron@Enron
cc: Kevin Kuehler/GPGFIN/Enron@Enron, Mary Jo Johnson/HOU/ECT@ECT, Garry D
Wilson/HOU/ECT@ECT, Gary A Hanks/HOU/ECT@ECT, James McKay/HOU/ECT@ECT
Subject: Spanish Camp to Mobil Vanderbuilt 14-inch interconnect

Glenn,

Mary Jo Johnson is working on a facilities agreement with Mobil to
interconnect the Spanish Camp 6-inch line to the Mobil 14-inch Vanderbuilt
pipeline. HPL will be responsible for setting a 6"x6" tee, riser, and
above-ground valve on the Spanish Camp lateral. I suggest the 6x6 because
the gas sales contract that will go along with the facilities agreement
should specify an HPL scheduled delivery rate from 0 to 20,000 MMBtu/d. The
6-inch will minimize pressure losses off of the Spanish Camp line and will
maximize our ability to expand this point in the future, if necessary.
Assume that we will need to acquire a small section of surface easement for
the above-ground valve.

Looking at our as-built drawings (HC-1025-09-H) it appears that the Mobil
line crosses the Spanish Camp 6-inch at Station Plus 77+40 in the middle of a
pasture. I spoke with Lonnie earlier today, who said that he would be in
that area on Wednesday and can verify that I have correctly located the
line. The crossing pipeline is incorrectly identified as a 16-inch Natural
Gas line on the as-built.

Mary Jo has asked for some agressive timing on setting the tee, in that she
would like to have it set for an 1 October, 1999 completion date. In that
light, would you please approach this from the perspective of preparing a
work-order rather than a preliminary cost estimate.

If any of these specifications change, I will let you know immediately.

Thanks,
Chris Sonneborn
HPL Facility Planning
N.A. Gas and Transmission Asset Group