assumptions based on following with Bruce's notes
Development of 1 LM 6000 facility in a urban area for the purposes of=20 supplying the rapid load growth. ENA will contribute the turbines to=20 Rochester and build the facility, while Rochester will own, operate and=20 finance the facility. Rochester currently has a Westinghouse 251B=20 (oil-fired), which is dedicated to =01&SMPA=018. ENA will receive 100% of = the=20 output through a PPA for the first year (summer 01) and 50% of the output= =20 from 2002 through 2005. The following are the project specifics: ? 1 LM 6000 Turbine ? Rochester actually needs only 23 MW=01,s from the facility - assume want = full=20 Enhanced Sprint and maximized output for summer conditions ? Needs substation and compressor=01,s (NNG is only 400 psi). - Substation= =20 estimate of $5.8M to $6.0 looks really high. I would usually assume single= =20 transformer and connection to an existing bus - so one breaker/switch combo= -=20 maybe $935,000 for a greenfield - maybe 775,000 on the way high side for th= is=20 opportunity unless RPC needs some sort of major expansion and this really= =20 includes transmission lines, .....I will assume 115 kV on a transformer and= =20 we will add as Owners cost the $5.8M. will do compression to 700 psig from 400 psig ? Peoples is the closest LDC ? No SCR Needed; Water-injection with water on-site - assume trailer demin,= =20 12 hours of storage ? Non-PSD ? Main fuel will be natural gas (100% of the time) with Fuel oil #2 as back= up=20 - will have as dual fuel unit, assume no storage based on existing at site,= =20 will have forwarding pump ? Water source will be from a local muni water system -need to get water=20 analysis so we can get good cost/1000 gal estimate Assume that we want bidable performance numbers - we need tasking letter to= =20 cover Engineering pulling the ambient weather data and running performance= =20 (capacity and heat rate - will generate new & clean with EPC margins along= =20 with expected heat rates for first 4 years based on 1500 hours operation pe= r=20 year) Assume we want cost estimate - Nepco just did a single unit estimate and is= =20 going out with a proposal (cost is $26,000,000 starting from what they=20 indicated was the ENA LM pricing - no scope list so Mike and I will see ifn= '=20 we can sweet talk Redmond out of a copy). Probably should get a Nepco two d= ay=20 version - I will fill the shett out and work through Mike Coleman to get=20 Nepco on cost. Likely will special noise considerations. we don't have an estimate -=20 probably should engage consultant to do quick study and see what we might b= e=20 faced with. Any site data available? plot plans, substation one-lines, ....???? Bruce Benjamin Rogers@ECT 02/14/2000 05:42 PM To: Bruce Golden/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT cc: Oscar Dalton/HOU/ECT@ECT=20 Subject:=20 Here is the summary of the Rochester deal. Oscar, Russ and I would like to= =20 sit down with you tomorrow to discuss the specifics of the deal. Please let= =20 me know if you need anymore info than this and let me know what time is bes= t=20 for you. Thanks in advance for your time. Ben
|