![]() |
Enron Mail |
Clement,
I do not believe that Ozzie has given his two copies of the summary info to FPL yet. If not, let's get them back and make these changes plus the changes that to the summary chart that you discovered. Thanks, Don ---------------------- Forwarded by Don Miller/HOU/ECT on 05/13/2000 11:54 AM --------------------------- Winston Cheng 05/12/2000 06:43 PM To: Michael Etringer/HOU/ECT@ECT cc: Clement Lau/HOU/ECT@ECT, Don Miller/HOU/ECT@ECT Subject: Pastoria Mike, I was speaking to Sam and he had two comments to the Pastoria document that Don Miller is preparing. Sam wanted to change two items in the Estimated Timetable: 1) Change "Start of Construction" to "Start of Construction and Engineering" 2) Change Testing date from December 2002 to January 2002. Winston
|