![]() |
Enron Mail |
---------------------- Forwarded by Don Miller/HOU/ECT on 10/23/2000 09:44 AM
--------------------------- Chris Norris@ENRON_DEVELOPMENT 10/23/2000 09:35 AM To: Don.Miller@ect.enron.com, Mitch.Robinson@ect.enron.com cc: Ross.Newlin@enron.com Subject: Plant Load Questions This info was asked on another. Here is what we supplied and this is per the design not empirical. Martin Dick is the design engineer at Nepco. 425 415 3000 if questions. ---------------------- Forwarded by Chris Norris/ENRON_DEVELOPMENT on 10/23/2000 09:39 AM --------------------------- MartinD@nepco.com on 10/19/2000 03:39:40 PM To: Chris.Norris@enron.com cc: Subject: Plant Load Questions Based on the plant design (not measured values), the Full Load Parasitic would be about 4,600 kW, the "Stand-By" Parasitic load would be about 385 kW (power backfed through GSU Transformers). If the plant is held in "Stand-By" without the GSU's energized, then the parasitic drops to about 85 kW. Mike Connelly is expected back in Bothell tomorrow. He should be checking his e-mail so you might want to sent him a message (if you haven't done so already).
|