Enron Mail |
We need to make the Enpower sale for 7 mws under ST-NW all day.
All length over 7 mws we treat as normal length. Call with questions. Thanks, Bill -----Original Message----- From: Semperger, Cara Sent: Friday, June 01, 2001 1:42 PM To: Portland Shift Cc: Scholtes, Diana; Crandall, Sean Subject: We have length at Colstrip all hours on Monday, June 4 We are 7 MW long all hours at Montana System, which is our buy from MPC, deal number 615780.1 The upstream is PSEI-DUKE-WWP-MPCO. We put in a false schedule to Smurfit to get flat preschedule, and that tag is 23795. When we get close to HE 0100 on Monday, that Tag needs to go away, and the energy needs to be sold. Please don't say it was a false preschedule, just say that it was 'unexpectedly ramped down' or something. Enpower accurately reflects the length at Montana System Cara
|