Enron Mail |
---------------------- Forwarded by Holden Salisbury/PDX/ECT on 05/02/2001 11:05 AM --------------------------- "WSCCNet" <wsccnetmail@wscc.com<@wscc.com on 05/02/2001 09:45:56 AM Sent by: Maiser@wscc.com To: "WSCC Internet Forward List" <wsccnetfwd@wscc.com< cc: Subject: FW: WSCC May 8, 2001 SPRING SYSTEM TEST Control Areas one week no -----Original Message----- From: WSCC1 Sent: Wednesday, May 02, 2001 10:47 AM To: All WSCC Subject: RE: WSCC May 8, 2001 SPRING SYSTEM TEST Control Areas one week notice REGARDING THIS TEST, A QUESTION HAS ARISEN ABOUT ACTIONS TO BE TAKEN SHOULD ANOTHER (NONTEST) UNIT TRIP DURING THE PERIOD WHEN AGC IS SUSPENDED FOR THE TEST. The CMOPS Chair, the Test Director and WSCC Staff discussed this question and all are agreed that the control area(s) affected by tripping of a unit not intended as part of the test should return AGC to service and attempt to meet DCS requirements. Bill Comish WSCC -----Original Message----- From: BPA2 Sent: Tuesday, May 01, 2001 10:07 AM To: All WSCC Subject: WSCC May 8, 2001 SPRING SYSTEM TEST Control Areas one week notice To all WSCC Control Area operators This is the 7 day notice of WSCC System test on May 8, 2001 for the proposed Frequency Responsive Reserve (FRR) Operating Policy obtaining the system response information under the existing MORC spinning reserve policy. The WSCC is proposing changes to the Operating Reserve policy that would change Spinning Reserve practices to newly proposed Frequency Responsive Reserve (FRR). The new policy specifies the minimum MW component of FRR that should be achievable in 60 seconds. A Summer(Fall) test is also being planned for June 7. ** During the generator dropping tests all WSCC Control Areas are to suspend AGC 3 minutes prior and restore 4 minutes after the generator trips. This is to have unhindered governor response throughout the system. ** The test sequence is similar to the June 2000 WSCC System Test WSCC Frequency Responsive Reserve (FRR) generator dropping test May 8 (light loading) All times are in Pacific Advanced Time (PAT) and are subject to change when the tests are finalized. May 8, 2001 1250 Make final preparations for compliance with test objectives to be completed not later than 13:10 1310 Start continuous sampling of SCADA data (2 second sampling if possible) 1315 Chief Joseph Dynamic Brake Test 1 1317 AGC suspended and disable plant setpoint control at Hoover. 1320 Hoover (750 MW) generation trip 1324 AGC on and restore generation setpoint control to normal 1325 Start Hoover generation ramp-up (restore to pretest level within 5 minutes.) 1337 AGC suspended and disable setpoint control at NW RAS 1340 NW RAS (1250 MW) generation trip 1344 AGC on and restore NW RAS generation setpoint control to normal 1345 Start NW generation ramp-up (restore to pretest level within 5 minutes.) 1350 Stop continuous recording of SCADA data 1415 Chief Joseph Dynamic Brake Test 2 (Tentative) 1420 PDCI Mid-Level Probing Signal Test sequence (Four 2-minute tests), Tentative 1440 Finish test Each control area is requested to complete the Frequency Responsive Reserve Survey form for each of the two generator tripping tests. Refer to the instructions in the April 16, 2001 letter e-mailed to the WSCC Area coordinators. Test Director for WSCC Testing Task Force (TTF) Jim Burns @ BPA 360-418-2331 System Planning for WSCC Testing Task Force (TTF) Bill Mittelstadt @ BPA 360-418-8647
|