A conf. call was held Thursday afternoon to further discuss the pigging tim=
eline of the San Juan Lateral. Obviously there is concern with regards to = delaying the pigging project and how that might relate to line eff and ther= efore capacity impacts. A request was made to re-apply the DRA asap or by = April. It seems that after the last pig run the line eff. held it's own fo= r two weeks and then started to drop off significantly. The major concern = is, will we be able to continually bring the eff back to acceptable levels = with dry pigging? An agreement was reached to postpone any pigging efforts= until May or June while in the mean time we increase our pigging frequency= of the lateral and continue to monitor eff. results and cycle times. In o= ther words when we pig, how long before the eff. starts to drop significant= ly. Although it may be a long shot, if we can insure that by pigging on a = two or three week cycle the eff. of the lateral can be maintained to accept= able levels we may be able to postpone the DRA application until after Tarr= iff months (July & Aug.). Once through the hot tariff months we have an op= portunity to make it through the remainder of the year. $320,000 is on the= table for this project and that's why we really need to take whatever step= s are necessary to delay as long as we do not jeopardize throughput.... Rick and I would be appreciate hearing your view points or concerns with th= is plan but, in the mean time the following actions need to be taken: 1) Send a sample of liquids and/or solids from the last pig run to Ben Asa= nte for analysis. (Gallup Team) 2) Send a sample of solids from the inlet of Bloomfield to Ben Asante for = analysis. (San Juan Team) This sample may have to come from a seal gas fi= lter or fuel gas filter or??? Let me know if there are problems collecting= a sample in the next few days and we will put our heads togeather) 3) Start pigging on a two week cycle. Darryl S. agreed on the conf. call = to take whatever steps are necessary to work with everyone on the pigging. = Please do not exceed 15 days between pig runs. (Gallup and San Juan Teams= ) 4) Collect valve data on the same cylcle time as the pig runs whenever man= power and/or work loads permit. (Gallup and San Juan Teams) 5) Collect a sample of the liquids in the tank at Gallup and send in to Ti= m Sweeny for analysis. (Will you need to stir the tank before this is done= ?) The reason for this step is we may have the opportunity to re-use the o= ld DRA. (Gallup Team) Rick, you may want to contact Tim and insure he can= run this analysis for us. (713-569-7973) By the way, how many gallons do= we have in the tank at Gallup? We will need 4000 to 5000 for a reapplicat= ion... 6) If the sample of the old DRA at Gallup determines that the solution is = not fit for furhter use, work with Larry Campbell on disposing and insure t= he tank is available for a May/June timeframe of re-applying the DRA. (Gal= lup Team) 7) Gear up for an May/June timeframe to reapply the DRA if necessary. (Ga= llup and San Juan Teams) Get togeather and pick two or three dates that wi= ll work for you all and let Rick and I know. 8) Currently all the project dollars reside in the San Juan Team's plan. = Advisors need to get with Vera and determine what distribution needs to mad= e of those dollars to the Gallup Teams plan to insure overages are covered.= (Rick, Tiny and Vera) =20
|