Enron Mail |
fyi
there was a measurement adj during Feb at NNG Beaver (pressure base change) which caused fewer volumes to be measured resulting in approximately 60,000 mmbtus due NNG line pack has increased by approximately 253,000 mmbtus during March as a result of oba activity
|