![]() |
Enron Mail |
The measurement for meter 9800 - NNG Beaver - was about 100,000 mmbtus lower than expected in Feb 2002. Would you please check to see if you expect adjustments to be made?
thanks 2/02 SCADA 856,430 mmbtus 2/02 PGAS 749,338 mmbtus
|