Enron Mail |
-----Original Message----- From: Schoolcraft, Darrell Sent: Friday, July 27, 2001 4:25 PM To: Ward, Linda; Mulligan, Amy; Minter, Tracy Subject: TW Allocations When doing allocation process and we allocate points or groups on the Timely, Evening, or Non-Grid. We allocate with the capacities that are loaded from CAS. When allocating points or groups that have not previously been allocated on any of the previous cycles during ID-1 or ID-2 we need to use the flow rate calculation. . Example : Allocations are as follows The only point to be exempt from this method should be Socal Needles because of their window issue Timely: M/L Thoreau West System 1093.000 (capacity) I/B Link 700.000 (capacity) Laplata/Ignacio 500.000 (capacity) Socal Needles 775.000 (Window) Evening: Same sequence Non-Grid: Same sequence ID-1or ID-2: Same sequence shows up to be allocated. Since they were previously allocated on the earlier cycles we do not need to right mouse click and calculate flow and update capacity based on flow rate. The only time we should have to calculate flow rate is when there is a new point or group shows up that has not been previously allocated. The reason for the change is we have recieved more FERC data requests on capacities and scheduled volumes. lets try this for a while and see how it is working.
|