Is this what you were asking me for???
---------------------- Forwarded by David Roensch/ET&S/Enron on 11/14/2001 = 01:21 PM --------------------------- From:=09Byron Rance/ENRON@enronXgate on 07/19/2001 10:40 PM CDT To:=09Eric Faucheaux/ENRON@enronXgate cc:=09Arnold L Eisenstein/ENRON@enronXgate, Earl Chanley/ENRON@enronXgate, = Rich Jolly/ET&S/Enron@ENRON, David Roensch/ET&S/Enron@ENRON, Ben Asante/ENR= ON@enronXgate, Steve Crabtree/ENRON@enronXgate=20 Subject:=09RE: TW Capacity Affected for Red Rock Tie-ins After discussion with Arnold Eisenstein, the following are (very) tentative= dates for tie ins. =20 Station 2, mainline, October 22, 2001, 4 days Station 2, loop, November 5. 2 days =20 Station 1, mainline, March 4, 2002, 4 days Station 1, loop, March 13, 2002, 2 days =20 Station 2, mainline, March 18, 2002, 4 days Station 2, loop, March 28, 2002, 2 days. -----Original Message-----=20 From: Faucheaux, Eric=20 Sent: Thu 7/19/2001 4:53 PM=20 To: Centilli, James; Watson, Kimberly; Lindberg, Lorraine=20 Cc: Rance, Byron; Eisenstein, Arnold L.; Gottsponer, Morgan; Asante, Ben; S= choolcraft, Darrell; Graves, Jerry; Jolly, Rich; Chanley, Earl=20 Subject: TW Capacity Affected for Red Rock Tie-ins=20 The following volumes are capacities west of Station 1 that will result fro= m tie-in construction work slated for the Red Rock expansion. Tie-in assem= blies will be required on both the Mainline and Loopline at stations 1, 2, = and 3. New block and side valve assemblies for new compressor and scrubber= s will be installed on the suction side main and loop lines at each station= . The tie-in will entail blocking (isolating) a line segment within the st= ation yard on the suction side (each line done separately) thus creating a = dead leg back to the next upstream block valve crossover(s). Hence, all of= the flow will be forced into a single line when making tie-in on the adjac= ent pipeline line. The result of forcing all volumes into a single line wi= ll produce greater pressure losses in the operating segment to the existing= compression and reduce throughput due to lower suction pressure and respec= tive horsepower limitations. Discharge piping at the station having tie-in= work will be unchanged regarding valving configurations. Tie-in Schedule/Duration Capacity X-over Status CS 2 ML Oct '01 / 4 days 960 MMcfd MLV 3010-open us/ds x-over;= open us 30" x-over CS 2 LL Oct '01 / 2 days 960 MMcfd MLV 3010-open us/ds= x-over, open us 30" x-over CS 1 ML Mar '02 / 4 days 990 MMcfd MLV 2012 & 2011-open us/ds = x-over; open us 30" x-over CS 1 LL Mar '02 / 2 days 990 MMcfd MLV 2012 & 2011-open us/ds = x-over; open us 30" x-over CS 3 ML Apr '02 / 4 days 1010 MMcfd MLV 4012 & 4011-open us/ds = x-over; open us 30" x-over CS 3 LL Apr '02 / 2 days 1010 MMcfd MLV 4012 & 4011-open us/ds = x-over; open us 30"x-over Notes: 1. Specific schedule dates are forthcoming=20 2. Schedules could be impacted by material deliveries and is based upo= n receipt of construction permits=20 3. Durations consider working around the clock until completed=20
|