![]() |
Enron Mail |
Dale and Tracy:
We have never received a credit worksheet for preparation of a draft ISDA in either the name of Nevada Power (Company) or Sierra Pacific Resources. Sara Shackleton Enron North America Corp. 1400 Smith Street, EB 3801a Houston, Texas 77002 713-853-5620 (phone) 713-646-3490 (fax) sara.shackleton@enron.com Dale Rasmussen 02/22/2001 03:03 AM To: Jim Gilbert/PDX/ECT@ECT, Ed Clark/PDX/ECT@ECT, Christopher F Calger/PDX/ECT@ECT, Tracy Ngo/PDX/ECT@ECT, Shari Stack/HOU/ECT@ECT, Elizabeth Sager/HOU/ECT@ECT, Herman Manis/Corp/Enron@ENRON, Sara Shackleton/HOU/ECT@ECT cc: tmoore@llgm.com Subject: Las Vegas Cogen - Nevada Power Response to RFP In a mad dash to meet the RFP response deadline, a draft of the Response to RFP to be submitted by Las Vegas Cogeneration Limited Partnership and ENA to Nevada Power is attached. The Response to RFP is due tomorrow by overnight delivery. This is my first foray into the EEI Master, and particularly in connection with unit-firm power / tolling contracts. I would greatly appreciate a review and comment by Shari and/or Elizabeth, given the size and duration of the proposed transaction. One of the attachments is a partial cover sheet reflecting certain of the changes to the documents requested by Nevada Power. The full list of requests, as incorporated into the RFP form, is attached for reference. I am not satisfied with the provisions of the "unit firm" contract regarding availability/power delivery. We need to adequately document that the plant is allowed to be off-line, and not to make power deliveries, during maintenance periods. The "unit firm" definition should cover other unscheduled outages. Suggestions would be greatly appreciated. Please note that the form of ISDA contract is not attached. I understand Tracy has done the credit worksheet, and I hope to have a copy of the contract for attachment by noon tomorrow. Apologies to all for the rushed nature of this project. It has been one of those things. Your help is greatly appreciated.
|