Enron Mail |
COULD YOU PLEASE MAKE SURE WE GET ALLOCATED CONGESTION CHARGES FOR THE FOLLOWING WHEEL:
9/24 HE2 8MW. HE3 100MW. HE2 DID NOT PHYSICALLY FLOW AS IT WAS CUT BY US. THE CISO MESSED UP POSTING THE CONGESTION CHARGE AND POSTED FINALS WAY TO LATE). THANKS GEIR
|