Enron Mail |
-----Original Message-----
From: infopost@duke-energy.com@ENRON [mailto:IMCEANOTES-infopost+40duke-energy+2Ecom+40ENRON@ENRON.com] Sent: Friday, May 11, 2001 3:11 PM To: infopost@duke-energy.com Subject: TE Pipeline Maintenance Revision May 11, 2001 Texas Eastern Transmission (TE) will have planned maintenance work beginning at 9AM, Tuesday, May 15 and ending at 9AM Thursday, May 17 on the discharge of Blessing Compressor Station (BLE) and on the McAllen line downstream of the Pemex Interconnection (PMX). TE requests that prior to and during this period, to the maximum extent possible, shippers ensure that scheduled receipts into the system do not exceed scheduled deliveries out of the system in STX, ETX or the 24" system. This maintenance will block all gas moving East through Blessing Compressor Station, and due to the resulting limited capability to move gas out of STX/ETX, there will be a systematic scheduling required for all receipts between Blessing Station and Fagus Compressor Station (FGS) on the 24" system beginning at 9AM on gas day Tuesday, May 15. Based on currently scheduled volumes, the cuts could have a significant impact on scheduled receipts in the area specified. TE strongly recommends TABS parties rank their markets prior to 11 AM Monday. Please contact your Operations Account Manager if you have any questions. ******************************************************************* NOTE: Duke Energy Gas Transmission respects your online time and privacy. You have received this email because you elected to subscribe. To unsubscribe, login to the E-mail Notification Subscription page at http://www.link.duke-energy.com/script2/Notification.asp uncheck the appropriate checkbox, and click the Submit button.
|