![]() |
Enron Mail |
This letter is Planing's request for Engineering to look at the cost and timing to install in let air cooling on units 1 & 2. The summer ambient temperature is 95 F and the coolers should be designed to lower the inlet air 15 F to 80 F. Please leet me know what the timing will be to provided a + 15% cost estimate and the timing to install facilities.
Ron Matthews
|