Mark,=20

Let's discuss this. =20

Kim.

-----Original Message-----
From: =09Jolly, Rich =20
Sent:=09Thursday, December 13, 2001 10:52 AM
To:=09Roensch, David; Schoolcraft, Darrell
Cc:=09Watson, Kimberly
Subject:=09RE: Griffith Interconnect Pressure

Thanks Tiny. Kim and Darrell let us know how you want to do this and we'll =
move forward. If we can get some kind of agreement put together with Citize=
ns on what they need maybe we can do these changes one time. As you know we=
have had a lot of issues with them since start up.=20
Thanks
RJ
-----Original Message-----
From: =09Roensch, David =20
Sent:=09Thursday, December 13, 2001 7:52 AM
To:=09Schoolcraft, Darrell
Cc:=09Jolly, Rich; Watson, Kimberly
Subject:=09Griffith Interconnect Pressure

I'm going to try and clear this up:

Robert Francen (928-226-2219) with Citizens called about the Griffith inter=
connect a couple of weeks ago. He made a request that we configure our flo=
w control valve with a pressure control over-ride and reduce the supply pre=
ssure to the Citizens station supplying the Griffith power plant. Although=
I know the RTU has this capability, I told Robert that I would have to che=
ck with our Tech folks to see if we had this capability. My concern was th=
at by lowering our supply pressure to Citizens it would make it easier to s=
witch or split flows to the power plant with El Paso. El Paso's supply pre=
ssure runs a couple of hundred pounds lower than TW's in this area and they=
cannot get in to Citizens with incurring huge swings at Citizens and shutt=
ing TW in currently. So, simply stated, I did not want to proceed without =
direction from Marketing or Gas Control. If I remember correctly when I ca=
lled and discussed this issue with you a couple of weeks ago, we were in ag=
reement not do reduce the pressure supply to Griffith but, you were going t=
o communicate this with them. I am still getting calls from Robert and I'm=
not sure how to handle his request at this point. =20

Please do not confuse this issue with the Batching valve that is currently =
out of service. Also, do not confuse with Choquettes request to provide pr=
essure over-ride at this point as that can be done to provide steady state =
pressure with a flow control over-ride without reducing supply pressure dra=
matically to this interconnect point. (However, there is the concern that =
if we install pressure control with a flow control over-ride that we put ou=
rselves in the position of reducing this supply pressure over time and then=
getting into competing issues with El Paso. =20

I do not care how we configure this point. However, again it could have im=
plications for marketing and gas control so, I prefer that you all make tha=
t call.