![]() |
Enron Mail |
FYI, Kim.
-----Original Message----- From: Abdmoulaie, Mansoor Sent: Tuesday, January 29, 2002 8:13 AM To: Watson, Kimberly Cc: Asante, Ben; Matthews, Ron; Chanley, Earl Subject: FW: Questar I/C Estimate Kim It would cost approximately $515,000 to build all the necessary interconnect facilities to deliver gas to Questar at this location( please see attached "B" release from Engineering-Roswell). Since TW is constructing this project for Questar we need to add 31.16 % tax gross-up and that will make a total cost of $ 675,427 for the project. Again your previous cost of $702,000 , mentioned in the agreement with Questar, is fine because even "B" release cost estimates are approximately 15% ?. If you any questions please call me at anytime. Regards, Mansoor -----Original Message----- From: Chanley, Earl Sent: Monday, January 28, 2002 3:05 PM To: Abdmoulaie, Mansoor Subject: Questar I/C Estimate Mansoor The Questar I/C estimate for: 1) 12" hot tap on TW's 30" lateral on the suction side of Bloomfield hub 2) Measurement stations with 10" Ultrasonic tube Flow Control Positive Over Pressure shut-in EFM DAS Chromatograph Moisture Monitor H2S Monitor UPS System Building with climate control TOTAL COST = $515,000 Summary sheet for cost Totals SUBTOTAL Labor 93,677 Material 228,583 Subcontract 8,580 ----------- ------- 330,840 330,840 Domestic (%) Tax 6857 337,697 Material - frieght 18858 ----------- 356,555 ENGINEERING (LS) 10000 Eng - Contract 6000 Eng - Construct 8565 Eng- asbuilt - AsBuiltD 4963 ----------- 29528 386,083 PROJECT MANAGEMENT 7500 - Project Con 1,500 1500 ----------- 9000 395,083 Construction - Managem 4800 Construction - Inspect 20000 Construction - Insp,X-Ray 2500 ----------- 27300 422,383 Environmental 500 ----------- 422,883 ROW Direct salaries 500 Property Purchase 3500 ----------- 4000 426,883 District Labor 4800 ----------- 4800 431,683 Contingency 64753 Overhead - TW (%) 9929 AFUCD 8634 ----------- 83316 514,999 Total 514,999 Thanks Earl Chanley 505-625-8031
|