![]() |
Enron Mail |
L--
More unsubscribed capacity reporting.... Thanks, Kim. -----Original Message----- From: Hermanek, Patty Sent: Tue 7/31/2001 12:50 PM To: Abramowicz, Richard; Hass, Glen; Kuehl, Toby; Holmes, Bradley; Lohman, TK; Betancourt, Ramona ; Draemer, Mary ; Watson, Kimberly; Frazier, Perry; Kowalke, Terry; Paladino, Ranelle; Bianchi, Rita Cc: Sawyer, Lisa; Licciardo, Jeanne; Kedwaii, Hasan Subject: RE: TW Daily Unsubscribed Capacity Report Below is a link to the first version of the TW Daily Unsubscribed Capacity Report. http://hottapmo.ets.enron.com/Infopostings/tw/asp/et_unsub_capacity.asp Please review the report for the basic format only. Please keep in mind that the data is from model office, not production; and that the final format of the report will have filtering, sorting and downloading options. If you have questions, please let me know (x39516). Thanks. -----Original Message----- From: Abramowicz, Richard Sent: Tuesday, July 31, 2001 7:28 AM To: Hass, Glen; Kuehl, Toby; Holmes, Bradley; Lohman, TK; Betancourt, Ramona ; Draemer, Mary ; Watson, Kimberly; Frazier, Perry; Kowalke, Terry; Paladino, Ranelle; Bianchi, Rita Cc: Sawyer, Lisa; Licciardo, Jeanne; Kedwaii, Hasan; Hermanek, Patty Subject: In a meeting to discuss a new FERC commission ruling, it was decided that TW needs to post daily unsubscribed capacity information to the web by August 10th. Since the daily numbers will be the same as the monthly numbers for August through October, we will post the monthly numbers published through the new TW unsubscribed capacity system as if they were daily numbers. The posting will be for two days in advance. (i.e. on August 1, we will post numbers for August 3). Since these will be the same numbers used by EDI, TW's unsubscribed capacity EDI will not need to change at this time. To do this, TW's new unsubscribed capacity posting must be in production by the 10th. We will do our best to be ready for testing the daily posting by Monday, August 5. (Jeanne & Patty - is August 6th doable for testing and August 10th doable for production?) This is only a temporary solution until further analysis can be done to design the correct solution. The permanent solution must be in place before November 1. The meeting attendees were: Glen Hass Toby Kuehl Brad Holmes TK Lokman Ramona Betancourt Mary Draemer Kim Watson Perry Frazier Terry Kowalke Ranelle Paladino Rita Bianchi
|