![]() |
Enron Mail |
Steve,
I just ran into Tracy in the hall and she asked if on Trans Pecos the $131MM (or it could be $138MM) represented 100% or 50% of the cost. The $131 is 100% of the cost of the project. If we joint venture with KMI, our cost would be half of this. Call me if you have questions. Thanks, Kim.
|