![]() |
Enron Mail |
1618 PDT WACM TERMINATES REQUEST FOR COORDINATED OPERATION OF CONTROLLABLE
DEVICES FOR PATH 30 USF MITIGATION. Transfer Path: Path 30 (TOT 1A) Path transfer capability at time of message: 649 MW Path instantaneous flow at time of message: 590 MW Schedule across path at time of message: 351 MW The system conditions described in this communication are dynamic and subject to change. While the ISO has attempted to reflect the most current, accurate information available in preparing this notice, system conditions may change suddenly with little or no notice.
|