After yesterdays cuts there have been some changes in the Colstrip Cut Procedures.
-----Original Message----- From: Williams III, Bill Sent: Wednesday, August 01, 2001 12:47 PM To: Anderson, John; Bland, Todd; Dean, Craig; Guzman, Mark; Harasin, Leaf; Linder, Eric; Merriss, Steven; Meyers, Bert; Porter, David V.; Slinger, Ryan; Solberg, Geir; Symes, Kate; Williams III, Bill Subject: Fastest Way to Handle Colstrip Cuts When Colstrip goes down we will be short at Montana system and long at PGE System. We need to buy a transmission wheel from BPA (Account#736780) from PGE System to the Montana System Border. If need be we can also do a Buy-Resale with WWP to move the energy from PGE Sys/Mid-C/LOLO to the Montana System Border. The method for documentation and cleaning up enpower are below. 1.) Be sure to begin with a physical cut sheet (in drawer above SAR's). 2.) In enpower, build an index forward buy from PGE under STNW book for the total amount of mws cut due to colstrip going down. Use the DOW JONES MIDC index (remember to specify in the index if it is on or off-peak). Enter an offset of .10 . 2.) Enter a transmission deal from BPA. (MIDC to MPC SYS) The transmission fee is $2.52. Build the transmission deal under STNW. 3.) Go into deal scheduling and query under the counterparty PGE. Select all 4.) Bring up all deals of the counterparties involved at Colstrip---- specifically, Ashgrove,Conocpil, Energywesr, Louisiana Pacific, and Smurfit Stone, etc. (these enpower deal numbers can be located under the counterparties name in lotus notes.) 5.)Zero out the buy from PGE @MPC SYS 6.) Finally link the deals. 7.) Check real time postion manager, make sure you are flat. 8.) Make cuts in Lotus Notes Cuts Database (this is the most time consuming portion of this procedure). 9.) Make notes in Discussion Forum 10.) Email appropriate groups, Kate Symes, and myself. If you have questions regarding this procedure please let me know. Thanks, Bill
|